Refine your search:     
Report No.
 - 
Search Results: Records 1-6 displayed on this page of 6
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

J-PARC and new era of science

Oyama, Yukio

Nuclear Instruments and Methods in Physics Research A, 562(2), p.548 - 552, 2006/06

 Times Cited Count:17 Percentile:74.53(Instruments & Instrumentation)

High Intensity Proton Accelerator Project promoted jointly by Japan Atomic Energy research Institute (JAERI) and High Energy Accelerator Research Organization (KEK), named as J-PARC was started on April 1, 2001. The project was merged from the projects promoted by the both institutes, called Neutron Science Project and Japan Hadron Project, respectively. The accelerator complex of J-PARC consists of three accelerators: 400 MeV Linac, 3 GeV rapid cycle synchrotron and 50 GeV synchrotron, and four major experimental facilities: Material & Life Science Facility, Nuclear & Particle Physics (Hadron) Facility, Neutrino Facility and Nuclear Transmutation Experiment Facility. The present construction phase, Phase-I, excludes nuclear transmutation facility. The accelerators will be completed in 2007 with 200 MeV Linac, and an operation will start. The Neutrino facility will be completed in 2008 and the 200-400 MeV Linac will be constructed in 2008-2010.

Journal Articles

J-PARC construction and its linac commissioning

Yamazaki, Yoshishige

Proceedings of 9th European Particle Accelerator Conference (EPAC 2004), p.1351 - 1353, 2004/00

The J-PARC (Japan Proton Accelerator Research Complex) is under construction in JAERI Tokai site. The beam commissioning will start there by the end of 2006. Prior to this, the front end of the linac was beam-commissioned in 2003 at KEK. The negative hydrogen beam with a peak current of 30 mA was accelerated up to 20 MeV by the first tank of the three DTL's following the 3-MeV RFQ linac. The 324-MHz DTL contains the electro quadrupole magnets with water-cooling channels specially fabricated by means of electroforming and wire-cutting technologies. The construction status of the J-PARC accelerator is also presented.

Journal Articles

Status of high intensity proton accelerator project and its research program

Oyama, Yukio

Nihon Genshiryoku Gakkai Monte Karuro Ho Ni Yoru Ryushi Shimyureshon No Genjo To Kadai, p.183 - 191, 2001/01

no abstracts in English

Oral presentation

Development of a Rn removal system for future Xe-based neutrino detectors using resonant ionization

Sekiya, Hiroyuki*; Iwata, Yoshihiro; Ito, Chikara

no journal, , 

no abstracts in English

Oral presentation

Oral presentation

Status and upgrade of J-PARC accelerators

Hasegawa, Kazuo

no journal, , 

6 (Records 1-6 displayed on this page)
  • 1